Shaanxi North overhaul device key positions to prepare for production safety
Date:2013-03-04   View:3862

Business agency hearing on February 16

The section to Earth Wanshixing, the Spring Provisional earth Better Business Sheng. New Year's atmosphere has not yet departed, Shaanxi Beiyuan Chemical Branch chlor-alkali factory employees busy preparing to enhance the production load.

Ion exchange membrane cells are the key device of Shaanxi North Chemical Second Branch of key positions, each line six electrolyzer 196 unit slots on each electrolyzer. Management requirements, in accordance with the key device key positions critical devices in key positions after the outage period of time, put into use again must be checked to ensure its security.

February 13 chemical two branch exchange membrane electrolyzer the the membrane leak testing experiments. The confirmation verification by the staff, part of the ion-exchange membrane electrolysis unit slot leakage signs. The company immediately arranged for the maintenance personnel with the electric groove administrator, statistics and find a device file to verify the situation of the unit cell leakage, mold tools and instruments and spare parts ready to install. Install ion-exchange membrane unit slots complexity of the procedure, to quite a large number. The division of work, their duties, one by one to find the problem and analyze the reasons and discuss the exchange.

Shaanxi North workers serious working attitude and dedicated work of the spirit and lay a solid foundation for the safe operation of the entire production system, the key device key positions illness has been restored in their diagnosis and treatment.